Projects

wc

This complex project was undertaken in a live children’s hospital. It involved the upgrade of main operating suites as well as the extension to the hospital area.

meyer centre 1

Staged replacement of 3 boilers including associated pumps and flues.

Central city location which created challenges for logistics and access, overcome with meticulous planning and coordination to ensure minimal disruption / downtime for the system and client.

 

the great hall 4

New chilled water central plant system including large auditorium and swimming pool. Purposely designed to meet the universities future needs.

photojo 0070

This project was a highly complex replacement of 10MW of Chiller capacity consisting of 4 new high efficiency Powerpax chillers.

afs carpark 2

The design, supply and installation of carpark ventilation and smoke control for the mammoth 55,000m2 6 level underground carpark development. Consisting of over 350,000 l/s of ventilation, attenuation and masonry plenum arrangements for the new Adelaide Flagship Festival Center development.

Recent Projects

View more projects...
photojo sm 0077

Full design and construct of 20 storey 45,000m² office tower with 6 star Green star, 5 star NABERs energy rating located in the heart of the Adelaide CBD.

photojo sm 0235

The expansion of the new international and domestic airport terminals, including Installation of new central thermal plant including water cooled chillers, associated cooling towers, air handling plant and associated ducting reticulation, smoke control systems.

photojo sm 0236

Full design and construct of hotel and conference facility consisting of aircooled VRV, pretreated outside air ventilation and utilizing Climate Wizards and BMS system.

Contact Information

South Australia

 

Western Australia

2/107 Hayward Avenue

Torrensville, SA 5031

P: 08 8462 9700

F: 08 8462 9799

     

4 Iron Street

Malaga, WA 6090

P: 08 9302 6653

F: 08 9302 6654